MINIMO Job Reference
Latest Update On: 10-Feb-26
| Item | Client | Project Name | Trade | Nature | Area | Aspect | Project Period | Status |
|---|---|---|---|---|---|---|---|---|
| 1 | MGM Macau | MGM Macau L1 Slot LT Zone Cable Laying and HVAC Works | MEP | Installation | Macau SAR | Commercial | 2025-06 | Completed |
| 2 | Sun First International | Zona B10 dos Novos Aterros Urbanos Submersible Pump T&C | P&D | T&C | Macau SAR | Commercial | 2025-06 | Completed |
| 3 | Chong Man Cons. & Eng. Company Ltd | 50A 1ph Cable Wiring Work at 高美士佳利佳大廈10樓e座 | Electrical | Installation | Macau SAR | Residential | 2025-06 | Completed |
| 4 | Chong Man Cons. & Eng. Company Ltd | 50A 3ph Cable Wiring Work at 林茂海邊馬路明海灣25樓c座 | Electrical | Installation | Macau SAR | Residential | 2025-06 | Completed |
| 5 | MGM Cotai | MGM Cotai Subsoil Drainage Installation for Outdoor Landscape at Location 51 | Landscape | Installation | Macau SAR | Commercial | 2025-07 | Completed |
| 6 | Intercontinental Hotel Grand Stanford HK | PRV Replacement at 8/F Pipe Duct | P&D | Installation | Hong Kong SAR | Commercial | 2025-08 | Completed |
| 7 | Intercontinental Hotel Grand Stanford HK | ICGSHK Additional Pipe Flange Accessories for PRV Replacement Work at 8F | P&D | Installation | Hong Kong SAR | Commercial | 2025-08 | Completed |
| 8 | MGM Macau | MGM Macau L1 & L2 Ceiling Signage RGB Replacement | Lighting & Control | Installation | Macau SAR | Commercial | 2025-08 | Completed |
| 9 | W Macau | W Hotel SVRS Annaul Inspection for Swimming Pool | Pool & Water Feature | T&C | Macau SAR | Commercial | 2025-09 | Completed |
| 10 | Intercontinental Hotel Grand Stanford HK | ICGSHK Drainage Pipe Installation at 1F Italian Kitchen | P&D | Installation | Hong Kong SAR | Commercial | 2025-10 | Completed |
| 11 | MGM Cotai | MGMC Toilet Replacement at F&B Private Rooms | P&D | Installation | Macau SAR | Commercial | 2025-10 | Completed |
| 12 | MGM Cotai | MGMCMO Toilet Replacement at F&B Private Rooms | P&D | Installation | Macau SAR | Commercial | 2025-10 | Completed |
| 13 | Intercontinental Hotel Grand Stanford HK | ICGSHK Contactor Replacement Work for Chiller No.3 at B4 | HVAC | Installation | Hong Kong SAR | Commercial | 2025-10 | Completed |
| 14 | Intercontinental Hotel Grand Stanford HK | ICGSHK Bottle Trap and Pipe Replacement at 1F Italian Kitchen | P&D | Installation | Hong Kong SAR | Commercial | 2025-11 | Completed |
| 15 | Intercontinental Hotel Grand Stanford HK | ICGSHK SS316 Pipe Replacement for Washing Machine L3B at B4 Laundry | P&D | Installation | Hong Kong SAR | Commercial | 2025-12 | Completed |
| 16 | Intercontinental Hotel Grand Stanford HK | Bidet Handspray Set Installation for 33 nos. of Hotel Guestroom | P&D | Installation | Hong Kong SAR | Commercial | 2026-01 | Completed |
| 17 | Intercontinental Hotel Grand Stanford HK | ICGSHK Solenoid Valve Control Panel for Steam Pipe at B4 | Hot Water & Steam | Installation | Hong Kong SAR | Commercial | 2026-01 | Completed |
| 18 | Melco Studio City | Shower Knob Cover Electroplating in Hotel Guestroom | P&D | Installation | Macau SAR | Commercial | 2026-02 | Completed |
| 19 | Intercontinental Hotel Grand Stanford HK | ICGSHK SS316 Pipe Replacement for Washing Machine L3A at B4 Laundry | P&D | Installation | Hong Kong SAR | Commercial | 2026-02 | Completed |
| 20 | Intercontinental Hotel Grand Stanford HK | Flushing Water Pump Replacement at B4 Pump Room | P&D | Installation | Hong Kong SAR | Commercial | 2026-02 | Completed |
| 21 | Intercontinental Hotel Grand Stanford HK | ICGSHK DN150 Electrical BV Installation for Potable Water Intake at B4 | P&D | Installation | Hong Kong SAR | Commercial | 2026-02 | On-going |
| 22 | Intercontinental Hotel Grand Stanford HK | ICGSHK Temperature Regulator Replacement for Calorifier 3 at B4 | Hot Water & Steam | Installation | Hong Kong SAR | Commercial | 2026-02 | On-going |
| 23 | Intercontinental Hotel Grand Stanford HK | ICGSHK Pump Replacement for Steam Boiler 1 | Hot Water & Steam | Installation | Hong Kong SAR | Commercial | 2026-02 | On-going |
| 24 | One Central | One Central Storage Tank Low Level Signal with IoT Sensor | ELV | Installation | Macau SAR | Residential | 2026-02 | On-going |
| 25 | Sky Oasis | Softener Installation at The Lux Mansions Sky Oasis Block 14 30A | P&D | Installation | Macau SAR | Residential | 2026-02 | On-going |
| 26 | Intercontinental Hotel Grand Stanford HK | ICGSHK UPVC Pipe Diversion Work for Flushing Water | P&D | Installation | Hong Kong SAR | Commercial | 2026-02 | Awarded |
| 27 | Intercontinental Hotel Grand Stanford HK | ICGSHK Marble Replacement Work for Toilet at 1229 | Builder | Installation | Hong Kong SAR | Commercial | 2026-03 | Awarded |
| 28 | Intercontinental Hotel Grand Stanford HK | ICGSHK PRV & Y-strainer Replacement for Steam Pipe at B4 | Hot Water & Steam | Installation | Hong Kong SAR | Commercial | 2026-03 | Awarded |
| 29 | Correios, Telégrafos e Telefones | 16 R.do Lilau Irrigation System Replacement | Landscape | Installation | Macau SAR | Government | 2026-04 | Awarded |